(1)
The Lack of Cumulative Impact Analysis in the Environmental Licensing of the Industrial Port Complex at Pontal Do ParanĂ¡, on the Southern Coast of Brazil. SustDeb 2022, 13 (3), 138-172. https://doi.org/10.18472/SustDeb.v13n3.2022.44007.